Training / Management
Strategic Collaboration for Infill Drilling Execution Readiness
STRATEGIC COLLABORATION FOR INFILL DRILLING EXECUTION READINESS. Integrated Planning for Subsurface-Topsides Alignment, Multi-Well Risk Management, and Delivery Strategy Optimization
Who should attend
- Drilling Engineers
- Facility Engineers
- Subsurface Operations Advisors
- Planning Analysts
- Finance & Insurance Analysts
- HR & Organizational Development Professionals
- Government Relations Analysts
- Contracting & Procurement Specialists
About this course
STRATEGIC COLLABORATION FOR INFILL DRILLING EXECUTION READINESS. Integrated Planning for Subsurface-Topsides Alignment, Multi-Well Risk Management, and Delivery Strategy Optimization
This two-week technical and strategic workshop brings together a multidisciplinary team to prepare for the successful execution of an infill drilling campaign in a mature offshore asset. The workshop will address key challenges including subsea and topside integration, execution risks across multi-well drilling operations, well placement optimization, and alignment of contracting and delivery strategies.
Through expert-led modules, collaborative planning sessions, and strategic readiness exercises, participants will co-develop a unified roadmap for safe, efficient, and sustainable campaign delivery.
WHO SHOULD ATTEND Drilling Engineers, Facility Engineers, Subsurface Operations Advisors, Planning Analysts, Finance & Insurance Analysts, HR & Organizational Development Professionals, Government Relations Analysts, Contracting & Procurement Specialists, Project Managers
Day 1: KICKOFF & CAMPAIGN OVERVIEW. Plenary + Panel Session Infill Drilling being a secondary drilling strategy is used in oil and gas fields to increase recovery from a reservoir that is already producing. Instead of targeting brand-new areas, infill drilling involves placing additional wells within the existing field — in between the original (primary) wells — to extract hydrocarbons that might otherwise remain trapped.
Infill drilling scope and production targets Stakeholder alignment
Day 2: SUBSEA & TOPSIDE INTEGRATION. Technical Lecture with Case Study
The main topside interface challenges in infill strategies revolve around capacity, space, safety, tie-in logistics, and simultaneous operations risks. A successful infill program requires detailed brownfield integration studies to balance subsurface potential with topside limitations.
Day 3: DRILLING SEQUENCING & OPTIMIZATION. Engineering Workshop
Day 4: EXECUTION RISK MANAGEMENT. Simulation Exercise
Day 5: CONTRACTING & DELIVERY STRATEGY. Strategy Round Table
Day 6: FINANCIAL & INSURANCE PLANNING. Finance Workshop
Day 7: REGULATORY & GOVERNMENT ENGAGEMENT. Policy Roundtable
Day 8: ORGANIZATIONAL READINESS & HR STRATEGY. HR Led Breakouts
Day 9: INTEGRATED EXECUTION PLANNING. Group Exercise
Day 10: STRATEGY SYNTHESIS & CLOSEOUT. Presentations / Wrap-up
Scheduled sessions
| Dates | Location | Duration | Fee | Ref |
|---|---|---|---|---|
| 10 days · scheduled on request | Houston, TX | 10 days | $17,550 | US172527 |